Almost two years and we are heading towards the end of this unfortunate and costly supply issue.

The current supply situation is as follows:-

23.75 mg

Betaloc CR Tab 30 pack Pharmacode 2026945 only.

bet23

47.5 mg

Metoprolol-AFT CR Tab 90 pack Pharmacode 2482746 (approximately 1000 units left) once sold we will move onto

met475

Myloc CR Tab 30 pack Pharmacode 2376423 as first option. All orders for this strength and pack size will automatically be supplied as Myloc.

met47

Only when all stock of Myloc CR from the suppliers has been exhausted will we move to Betaloc CR only.

bet47

 

However if you have a robot and have new canisters to move directly from Metoprolol AFT to Betaloc, then you will need to phone or email your order needs.

95 mg

Myloc CR Tab 30 pack Pharmacode 2376431 as first option. All orders for this strength and pack size will automatically be supplied as Myloc.

myloc95

Only when all stock of Myloc CR from the suppliers has been exhausted will we move to Betaloc CR only.

bet95

However if you have a robot and have new canisters to move directly from Metoprolol AFT to Betaloc, then you will need to phone or email your order needs.

190mg

Myloc CR Tab 30 pack Pharmacode 2376458 as first option. All orders for this strength and pack size will automatically be supplied as Myloc.

myloc190

Only when all stock of Myloc CR from the suppliers has been exhausted will we move to Betaloc CR only. (Betaloc CR are only listed from 1 October 2017)

However if you have a robot and have new canisters to move directly from Metoprolol AFT to Betaloc, then you will need to phone or email your order needs.

It would be unusual for this to be acceptable to all however we are trying to accommodate everyone’s needs and the desire to ensure all stocks in the supply chain move through the system.

Please note that all products currently listed in the Pharmaceutical Schedule will remain listed and funded until 1 February 2018. After that date only Betaloc CR will be listed and funded. Therefore there is adequate time to move all current stocks through the supply chain without issue.

We ask you to work with us to make this as seamless as possible.

Should you wish to discuss then please do not hesitate to contact one of our CS Team, Key Account Managers or Branch Managers who are all fully informed of the situation.

 

 

 

 

 

 

 

About The Author

Close